Final environmental assessment, Naval Base Point Loma (NBPL), fuel pier replacement and dredging (P-151/DESC1306), San Diego, California
-
2013
Details:
-
Alternative Title:NBPL fuel pier replacement, final EA;Adoption of the U.S. Navy's Naval Base Point Loma fuel pier replacement and dredging (P-151/DESC1306) environmental assessment;
-
Personal Author:
-
Corporate Authors:
-
NOAA Program & Office:
-
Description:The United States (U.S.) Navy has prepared this Environmental Assessment (EA) in accordance with the 1969 National Environmental Policy Act (NEPA) (42 United States Code [USC] สน 4321, as amended), The Council on Environmental Quality (CEQ) Regulations for Implementing NEPA (40 Code of Federal Regulations [CFR] Parts 1500-1508), and the Chief of Naval Operations Instructions for Implementing NEPA (OPNAVINST 5090.1C, CH-1). The EA addresses the issues related to the current deficiencies of the existing Naval Base Point Loma (NBPL) Fuel Pier (Pier 180). It evaluates the environmental effects of two action alternatives that would correct the deficiencies and provide for the fueling needs of existing and future Navy ships. A No-Action Alternative is also evaluated.
-
Keywords:
-
Document Type:
-
Place as Subject:
-
Rights Information:Public Domain
-
Compliance:Submitted
-
Main Document Checksum:
-
File Type: