| Final environmental impact report, environmental impact statement for the San Clemente Dan Seismic Safety Project - :6315 | National Environmental Policy Act (NEPA)
Stacks Logo
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.
 
 
Help
Clear All Simple Search
Advanced Search
Final environmental impact report, environmental impact statement for the San Clemente Dan Seismic Safety Project
  • Published Date:
    2008
Filetype[PDF-298.27 MB]


This document cannot be previewed automatically as it exceeds 5 MB
Please click the download button to view the document.
Final environmental impact report, environmental impact statement for the San Clemente Dan Seismic Safety Project
Details:
  • Personal Authors:
  • Corporate Authors:
    California, Department of Water Resources, ; United States, Army., Corps of Engineers, ; United States, National Oceanic and Atmospheric Administration., Office of Program Planning and Integration,
  • Description:
    Volume 1. Chapter 1.0 (Introduction) -- Chapter 2.0 (Summary) -- Chapter 3.0 (Description of the alternatives) -- Volume 2. Chapter 4.0 (Environmental setting, impacts & mitigation measaures) -- Chapter 5.0 CEQA & NEPA considerations -- Chapter 6.0 (Lists and references) -- Volume 3. Appendix A (Notice of preparation) -- Appendix B (Notice of intent) -- Appendix C (Written comments received on public draft EIR/EIS) -- Appendix D (Transcript of public hearing on draft EIR/EIS) -- Appendix E (Responses to comments) -- Appendix F (Access route screening report) -- Appendix G (San Clemente Dam screening of sediment disposal sites) -- Volume 4. Appendix H (Sediment transport & disposal environmental constraints analysis) -- Appendix I (San Clemente Dam commercial value of sediment in the reservoir) -- Appendix J (Sediment operation and management plan for fish passage) -- Appendix K (Stormwater pollution prevention plan) -- Appendix L (Carmel River reach comparisons) -- Appendix M (Sediment transport modeling report) -- Appendix N (Summary of hydraulic and sediment-transport analysis of residual sediment: alternatives for the San Clemente Dam removal/retrofit project, California) -- Appendix O (Suspended sediment concentration associated with a sluice event) -- Appendix P (Suspended sediment concentration exceedance for the alternatives) -- Appendix Q (Water quality) -- Appendix R (Spill prevention and containment plan) -- Appendix S (Additional modeling to evaluate sediment sluicing options and compare downstream sediment concentrations for EIR/EIS alternatives, San Clemente Seismic Safety Project) -- Appendix T (A botanical report for six areas designated for possible alteration or disturbance in selecting a receiver site for sediment from behind the San Clemente Dam) -- Appendix U (Botanical resources management plan) -- Appendix V (Protection measures for special status species) -- Appendix W (Wetland delineation report) -- Appendix X (Air quality calculations) -- Appendix Y (San Clemente Dam Seismic Safety Project air quality conformity analysis) -- Appendix Z (Fire prevention and suppression plan)

    "Project Purpose, Need & Objectives: The need for the San Clemente Dam Seismic Safety Project is to increase dam safety to meet current design standards. The purposes and objectives for the project are to protect public safety by meeting current standards for withstanding a Maximum Credible Earthquake and Probable Maximum Flood at San Clemente Dam, provide fish passage at the dam, maintain a point of diversion to support existing water supply facilities, water rights and services, and minimize financial impacts to California-American Water ratepayers. Abstract: This Final EIR/EIS analyzes the Proponent's Proposed Project (dam strengthening) and the following alternatives: Alternative 1 (dam notching with partial sediment removal), Alternative 2 (dam removal with total sediment removal), Alternative 3 (Carmel River reroute and dam removal with in-place sediment stabilization), and Alternative 4 (No Project). Chapter 2 contains summaries of each alternative, and Chapter 3 contains detailed descriptions. With the exception of No Project, all of the alternatives evaluated in this EIR/EIS meet the purpose, need and objectives"--Information cover sheet.

  • Document Type:
No Related Documents.
You May Also Like: