The Weighted-Average Lagged Ensemble
Advanced Search
Select up to three search categories and corresponding keywords using the fields to the right. Refer to the Help section for more detailed instructions.

Search our Collections & Repository

For very narrow results

When looking for a specific result

Best used for discovery & interchangable words

Recommended to be used in conjunction with other fields

Dates

to

Document Data
Library
People
Clear All
Clear All

For additional assistance using the Custom Query please check out our Help Page

i

The Weighted-Average Lagged Ensemble

Filetype[PDF-657.98 KB]



Details:

  • Journal Title:
    Journal of Advances in Modeling Earth Systems
  • Personal Author:
  • NOAA Program & Office:
  • Description:
    A lagged ensemble is an ensemble of forecasts from the same model initialized at different times but verifying at the same time. The skill of a lagged ensemble mean can be improved by assigning weights to different forecasts in such a way as to maximize skill. If the forecasts are bias corrected, then an unbiased weighted lagged ensemble requires the weights to sum to one. Such a scheme is called a weighted-average lagged ensemble. In the limit of uncorrelated errors, the optimal weights are positive and decay monotonically with lead time, so that the least skillful forecasts have the least weight. In more realistic applications, the optimal weights do not always behave this way. This paper presents a series of analytic examples designed to illuminate conditions under which the weights of an optimal weighted-average lagged ensemble become negative or depend nonmonotonically on lead time. It is shown that negative weights are most likely to occur when the errors grow rapidly and are highly correlated across lead time. The weights are most likely to behave nonmonotonically when the mean square error is approximately constant over the range forecasts included in the lagged ensemble. An extreme example of the latter behavior is presented in which the optimal weights vanish everywhere except at the shortest and longest lead times.
  • Keywords:
  • Source:
    Journal of Advances in Modeling Earth Systems 9(7), 2739-2752, 2017
  • DOI:
  • Pubmed Central ID:
    PMC5784419
  • Document Type:
  • Funding:
  • Rights Information:
    CC BY-NC-ND
  • Compliance:
    PMC
  • Main Document Checksum:
  • Download URL:
  • File Type:

Supporting Files

  • No Additional Files
More +

You May Also Like

Checkout today's featured content at repository.library.noaa.gov

Version 3.27.1