i
Morphodynamic evolution following sediment release from the world's largest dam removal
-
2018
Source: Scientific Reports 8 (13279)
Details:
-
Journal Title:Scientific Reports
-
Personal Author:
-
NOAA Program & Office:
-
Sea Grant Program:
-
Description:Sediment pulses can cause widespread, complex changes to rivers and coastal regions. Quantifying landscape response to sediment-supply changes is a long-standing problem in geomorphology, but the unanticipated nature of most sediment pulses rarely allows for detailed measurement of associated landscape processes and evolution. The intentional removal of two large dams on the Elwha River (Washington, USA) exposed similar to 30 Mt of impounded sediment to fluvial erosion, presenting a unique opportunity to quantify source-to-sink river and coastal responses to a massive sediment-source perturbation. Here we evaluate geomorphic evolution during and after the sediment pulse, presenting a 5-year sediment budget and morphodynamic analysis of the Elwha River and its delta. Approximately 65% of the sediment was eroded, of which only similar to 10% was deposited in the fluvial system. This restored fluvial supply of sand, gravel, and wood substantially changed the channel morphology. The remaining similar to 90% of the released sediment was transported to the coast, causing similar to 60 ha of delta growth. Although metrics of geomorphic change did not follow simple time-coherent paths, many signals peaked 1-2 years after the start of dam removal, indicating combined impulse and step-change disturbance responses.
-
Keywords:
-
Source:Scientific Reports 8 (13279)
-
Pubmed Central ID:PMC6125403
-
Document Type:
-
Place as Subject:
-
Rights Information:CC BY
-
Compliance:PMC
-
Main Document Checksum:
-
File Type:
Supporting Files
-
No Additional Files
More +